Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

January 3, 2025

October 2, 2026

To Be Determined

Site Work

No Information to Display

$810,000.00

Public - City

img_map_placeholder

To Be Determined, Lincoln, NE

41

17

2

3

Subscribe to View Full Documents

The intent of this specification is to set out minimum requirements for the construction, retirement and installation of electric transmission facilities that meet the construction standards of Lincoln Electric System (LES). This specification covers the retirement, construction, assembly, and installation of the poles, insulators, conductor, shield wires, and other hardware items of the LES transmission project(s) included in this contract. It shall be the responsibility of the contractor to review the drawings and visit the construction site to determine any adverse conditions and to take into consideration all details of the construction which are not covered in this specification. All lines to be constructed with self-supported galvanized steel monopoles. Phase conductors are a combination of bundled 397.5 26/7 T2 (Ibis), bundled 954 45/7 Rail, and single 954 45/7 Rail. Shield wires are a combination of OPGW and 7#8 Alumoweld. Phase conductors will be supported by polymer suspension insulators, braced post insulators, and glass deadend insulators. All transmission corridors will be acquired and cleared of vegetation prior to construction. All work is expected to fall within the Completion Schedule provided in writing by LES. 345kV L1485 - WO: 5039136: Install new transmission line consisting of 1.1 miles of 345kV construction, 0.5 miles of which is double circuit with 115kV L1315. Retire approximately 0.7 miles of 345kV transmission line south of the new 56th & Bluff Substation which is double circuit with a 115kV line. Six steel double circuit tangent structures will be removed. To the extent practical, the existing line shall be left in place until the new line is nearing completion in case it needs to be reenergized in short notice. 115kV L1315 - WO: 5039137: Install new transmission line consisting of 0.7 miles of 115kV construction, 0.5 miles of which is double circuit with 345kV L1485. 115kV L1369A - WO: 5039137: Install new 115kV transmission line consisting of approximately 0.6 miles of 115kV construction. 115kV L1375 - WO: 5039137: Install new 115kV transmission line consisting of approximately 3.3 miles of 115kV construction. L13C104 T/C/D, L13C106 T/C/D - WO: 5039147: Install new 115kV transmission lines consisting of 0.6 miles of new single circuit 115kV construction. West Perun substation may not be ready for the final spans as part of this project. Overall Construction Window: January 3, 2025, to October 2, 2026 Question Deadline 09/17/2024 at 4:00 PM CT All questions must be submitted through this ONLINE under the clarifications tab.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects