Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

December 2, 2024

March 24, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$1,993,000.00

Public - City

img_map_placeholder

Multiple Locations, Millbrae, CA

26

9

5

Subscribe to View Full Documents

The work to be performed under this contract consists of the following major items of work as listed below and as further described in the solicitation documents: In general, the work to be performed consists of but is not limited to, the removal and replacement of existing 6-inch or 8-inch sewer mains with 8-inch sewer mains using trenchless and open cut pipe replacement construction methods, sewer lateral reconnections & replacement, sewer manhole reconnections, cleanout and/or backflow prevention devices, sewer and storm drain manhole installations and rehabilitation, surface restoration, pavement restoration, potholing, asphalt concrete removal, asphalt concrete installation, asphalt concrete base repair, slurry seals, ADA ramp construction, PCC curb & gutter removal and replacement, PCC sidewalk removal and replacement, PCC valley gutter removal and replacement, storm drain inlet top portion replacement, utility cover lowering & restoring to grade, utility cover grade adjustment, underground utility location, survey monument reinstallation, sign/striping/markers removal & replacement, traffic control, mobilization, manhole modifications, sewage bypassing and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer. Replacement of sanitary sewer and pavement rehabilitation in landing lane, oak street, berni court and san anselmo avenue in the marina vista neighborhood and millbrae circle in millbrae highlands neighborhood. Type of Award Lump Sum Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 09/24/2024 at 5:00 PM PT Online Q&A: Yes Contact Info Heather Ruiz 650-259-2419 hruiz@ci.millbrae.ca.us Engineer's Estimate: $1,993,000 License Required: CSLB Class A General Engineering Time of Completion shall be Eighty (80) working days after issuance of the Notice to Proceed. Liquidated damages for failure to complete the work within the specified time are specified in the Contract Documents. The Millbrae City Council reserves the right to accept or reject any and all bids, alternate bids, or unit prices and/or waive any irregularities in any bid received.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.