Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 24, 2025

No Information to Display

150 SE 2nd St

Renovation

No Information to Display

$260,000.00

Public - City

img_map_placeholder

150 SE 2nd St, Fort Lauderdale, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Design Services for the Riverwalk Center Parking Garage Repairs Riverwalk Center Parking Garage is an existing 7 story parking garage that spread over approximately two city blocks. The garage accommodates approximately 2200 car spaces with a helipad that is separate from the structure and not included in this scope of work. The portion of the facility that is not used as car space is comprised of offices and retail shops/malls situated on the north side of the garage at the first level, The work under this contract includes Engineering Design Services for Structural, Mechanical, Electrical, and Plumbing systems. Specific tasks include: - Repairs and updates to fire department connections (FDC) lines and standpipes throughout the garage. - Upgrades to the electrical system to support recent elevator improvements. - Pressure washing and waterproofing the exterior of the building and top slabs. - Installation/replacement of damaged or missing perimeter wood rails at all levels. - Removal of rust and painting of all metal tube rail behind wood rails at all levels. - Painting of stair rails/handrails/posts The project will be performed at the Riverwalk Parking Garage located at 150 SE 2nd Street, Fort Lauderdale, FL. Period of Performance The work shall commence within 14 calendar days of the Notice to Proceed. Substantial completion is expected within 180 calendar days after commencement. The initial contract term is two years from the award date, with options for two additional one-year extensions. Q And A Close 9/17/2024 5:00:00 PM Est. value Range $500,000 -$2,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.