Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

December 23, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$19,144,325.00

Public - County

img_map_placeholder

Multiple Locations, Chicago, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe to View Full Documents

HVAC Improvements at Various Locations Estimated Cost Group A: $18,443,000.00 Bid Deposit Group A: $737,000.00 Estimated Cost Group B: $701,325.00 Bid Deposit Group B: $28,000.00 Total Estimated Cost: $19,144,325.00 Total Bid Deposit $765,000.00 Any questions regarding the downloading of the Contract Document should be directed to the following email: contractdesk@mwrd.org or call 312 751 6643. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.), where it is stated in the Invitation to Bid Page. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals if deemed in the public's best interest. Metropolitan Water Reclamation District of Greater Chicago DESCRIPTION OF WORK The work to be performed under Groups A and B in this Contract consists of providing all labor, materials, tools, supplies, supervision, scaffolding, transportation, equipment, and all appurtenances required for the following work and all work as shown on the Plans and specified herein: Group A Remove and replace air handling units, cooling towers, steam heat exchangers, pumps, electrical equipment, supply and exhaust ductwork, mechanical and plumbing piping, electrical conduits, pneumatic controls, grilles, registers, diffusers, VAV boxes, reheat coils, etc., and all associated hangers and supports at the Engineering Center, M&R Building, and OSS Building. Furnish and install new chiller at the OSS Building. Install new plus modify existing building control system at Engineering Center, M&R Building, and OSS Building. Group B Install new gas meter and startup existing hot water boiler and radiant floor heating system in the Heavy Equipment Building plus install new underground gas line and new HVAC heating system in the Building 25 at the Calumet WRP. In addition, upgrade controls at existing steam boilers and modify steam piping at the 95 th Pump Station.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.