Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

September 15, 2025

465 Dr Martin Luther King Jr Blvd

Renovation

No Information to Display

$200,000.00

Public - County

img_map_placeholder

465 Dr Martin Luther King Jr Blvd, Newark, NJ

40

20

Subscribe to View Full Documents

Request for Information (RFI) No: 003 Date of RFI: September 11,2024 o Performance Period o Two Hundred Seventy (270) Calendar Days from Notice to Proceed Question Deadline 09/12/2024 at 4:30 PM ET All questions must be submitted to the Purchasing Agent in writing via fax to 973-621 -5109 New High-Pressure Steam Boiler Hall of Records Power House - Temporarily remove an existing window unit in order to provide rigging access for the installation ofthe new boiler. Reinstall window after installation of new boiler. Repair and restore all brickwork surrounding the window and replace any broken bricks. -Demolish selected segments of existing piping. Demolish existing Plant Monitoring Panel. -Provide one (1) new high pressure steam boiler with appurtenances including aircompressor (for oil atomization), piping, control valves, manual valves, safety valves, insulation, labeling and identification, plant controls and related components. Provide new burners, burner controls, fuel oil atomizing air compressors, Bumer/Combustion Control Panel, Boiler Control Panel and Plant Master Controller. -Provide flow meters for steam, gas and fuel oil for the new boiler. -Tie-in existing Boilers #2 and #3 to the new Plant Master Controller. Tie in existing steam and gas flow meters from Boilers #2 and #3 to the new Plant Master Controller. -Provide all field piping, valves, pipe supports and hangers, insulation and ID labeling and tags. Modify existing access platform as indicated on the Drawings as necessary to gain access to selected valves and controls. -Tie in new boiler and its related piping to the existing systems including existing deaerator and boiler feed water, make-up water, chemical treatment, blowdown, steam venting, drainage, exhaust flue, fuel oil and natural gas systems -Paint the existing concrete pad below boiler. Paint all insulated and uninsulated piping as specified. Label all piping, valves and equipment as specified.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.