Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

November 11, 2024

June 30, 2025

OR-8

Paving, Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

OR-8, Beaverton, OR

Our team is requesting plans for this project.

Subscribe to View Full Documents

Region 1 PE EA PE003233 CON EA CON04778 OR8 Corridor Safety & Access to Transit Ii Project Tualatin Valley Highway Rick Smith, Re. Estimated Value: ($ 500,000 - $ 1,000,000). Req. approx. 1,200 ft2 temp. signs; 2 ea. PCMS; 250 hr flaggers; 2 ea. TMA; 850 ft2 temp. walks; 80 ton contam. soil disp.; const. surv. work; 71.4 yd3 gen. exc.; 139 yd2 CPPR; 83 ton aggr. base; 26 ton ACP; 317.8 ft conc. curbs; 380 ft2 conc. island; 1,300 ft2 conc. walks; 5 ea. curb ramps; 58,000 ft thermo. pvmt. marking; 510 ft2 pvmt. bar; 1,800 ft2 green preform. thermo. film; 95.2 ft2 signs; pole foundations; lum., lamps, ballasts; switch., conduit, wiring; lighting poles & arms; flashing beacon install.; unintegrated speed feedback assembly; 130 ft CL fence. This project requires Railroad Insurance. Completion Time: June 30, 2025. Class of Work: A) Pavement Markings, or B) Electrical This Project Contains Fuel Escalation Clause. The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 OR DOT - 002 - OR8 Corridor Safety & Access to Transit II *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects