Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

December 2, 2024

December 31, 2025

75 Rev Dr Martin Luther King Jr Boulevard.

Renovation, Site Work

No Information to Display

$1,732,562.00

Public - State/Provincial

img_map_placeholder

75 Rev Dr Martin Luther King Jr Boulevard., Saint Paul, MN

26

13

2

5

Subscribe to View Full Documents

Best Value Replace Exterior Lighting LED, Capitol Building. Site Address: 75 Rev. Dr. Martin Luther King Jr. Blvd. Est. Completion Date: Dec. 31, 2025. Est. Value: $ 1,732,562.00. All questions should be submitted no later than September 23, 2024, by 2:00PM. The State is not obligated to answer questions submitted after the question due date and time. Description: State Project Number 02CB0072 Replace Exterior Lighting LED at the State Capitol Building A. The work will be done under one prime contract that includes: General, Demolition, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Replacement of exterior lighting fixtures and associated wiring and devices. 2. Maintenance of masonry at locations of fixture removal. 3. Maintenance of masonry and waterproofing at new conduit locations. 4. Interior finish patching and repair at locations of conduit routing. 5. Site restoration at all disturbed site locations. This solicitation requires a General Proposal response from prime contractors. See Section 00 21 27 Best Value Request for Proposal Evaluation Process for the General Proposal requirements. Response requirements include, but are not limited to 1. Project Approach and Work Plan. 2. Project Schedule 3. Prime Contractor's Experience with Comparable Projects. 4. Subcontractor's Experience. 5. Safety Program. This Project has a 5% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.