Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 23, 2024

October 23, 2024

May 30, 2025

1900 E Brady Ave

Renovation

No Information to Display

$500,000.00

Public - County

img_map_placeholder

1900 E Brady Ave, Clovis, NM

69

26

17

Subscribe to View Full Documents

On behalf of the Board of Curry County Commissioners and pursuant to and in compliance with the NM State Procurement Code, Curry County hereby invites competitive sealed bids for the Renovation of the Indoor Pavilion at the Curry County Fairgrounds in Clovis, NM 88101. Last Day to Ask Questions: September 9, 2024 at 5:00 p.m. Submit Questions to : Ben Roberts b. Telephone: (575) 763-6016 c. Email: broberts@currycounty.org A 100% Performance Bond and a 100% Payment and Materials Bond executed by a surety company authorized to do business in the State of New Mexico shall be required from the successful Offeror prior to award of contract. A completed Subcontractor Listing Form, pursuant to 13-4-31 through 13-4-42 NMSA 2018 must accompany each BID. Subcontractor listing form must comply with the Subcontractor's Fair Practices Act (13-4-31 to 13-4-42, NMSA 2018). Project no- J23-1-1011 SCOPE OF SERVICES The project includes extensive interior demolition of an existing structure to also include electrical, mechanical and plumbing systems and to renovate the structure according to the Drawings and Specifications prepared by Formative Architecture. A summary of services the General Contractor shall perform to complete the Project, include, but are not limited to, the following: a. Planning, supervision and timely completion of the Project b. Prepare, monitor, and maintain the established Project schedule including scheduling and phasing the Work to allow for continuous operation of the existing County facilities c. Material procurement, delivery, and storage d. Submittals and Project documentation e. Manage construction labor and materials f. Coordinate with Owner direct labor, subcontractors, and Owner furnished equipment suppliers, if applicable g. Manage site access, safety, security, and quality control h. Manage testing and inspections i. Coordination of all utility inspections j. Project close-out and inspection

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.