Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 25, 2024

March 25, 2025

685 Wilson Blvd

Renovation

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

685 Wilson Blvd, Savannah, GA

36

26

12

2

Subscribe to View Full Documents

Hunter Army Airfield, Georgia- Corner Express 2.0 Image Update Project Number: 0757-21-000004 This project will be an interior image update of Hunter AAF Corner Express (Bldg 931) to new 2.0 Express standards including adding two (2) QSPs (Hunt Bros Pizza & Chopz). Scope also includes replacing non-functional external walk-in cooler/freezer with new to support new QSPs. Interior scope is 9,123 sf total. In order to participate in this solicitation, please refer to link provided. Any and all amendments will be posted on our website, and must be acknowledged, when submitting a proposal. https://odin.aafes.com/ConstructionSolicitations/ This project will be an interior image update of Hunter AAF Corner Express (Bldg 931) to new 2.0 Express standards including adding two (2) QSPs (Hunt Bros Pizza & Chopz). Scope also includes replacing non-functional external walk-in cooler/freezer with new to support new QSPs. Interior scope is 9,123 sf total. Question Deadline 09/11/2024 Any questions you may have after comparing the plans and specifications to the existing site conditions should be submitted in writing to David Combs at combsdmaafes.com. If total lump sum cost proposal exceeds $25,000 or if otherwise required herein, a proposal bond is required to be submitted in the penal sum of 20% of the proposal amount. Failure to furnish the proposal bond by the time and date set for receipt of proposals in the amount set forth in the solicitation may be cause for rejection of the proposal. The Performance Bond will be executed on EXCHANGE FORM 4400-041 and in the penal sum of one hundred percent (100%) of the contract price. The Payment Bond will be executed on EXCHANGE FORM 4400-040 and in the penal sum of one hundred percent (100%) of the contract price. The contract price means the award of the contract. The construction period will be 120 calendar days. The Exchange reserves the right to reject any or all proposals and to waive informalities and minor irregularities in proposals received. The cost of the project is estimated to be in the range between $500,000.00 and $1,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects