Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 18, 2024
May 13, 2025
May 13, 2026
Multiple Locations
New Construction, Paving, Site Work
No Information to Display
$4,100,000.00
Public - County
Multiple Locations, Cascade, ID
A Bid Bond in the Amount of 5% of the Total Bid Amount, Including Any Add Alternates, is Required. A Public Works Contractors License for the State of Idaho is Required to Bid on This Work. Projected Construction Budget: $4,100,000 Douglas If you have any questions, please call us at (208) 376-4748. questions concerning a bid must be directed in writing to the designated Design Professional (architect or engineer) Scope: 1. Prior to final acceptance by the Owners, all air and water systems shall be balanced to deliver the quantities as specified or directed. The air and water balance shall be performed by an independent agency specializing in balancing and is certified by the National Environmental Balancing Bureau. 2. Prior to final acceptance by the Owners, all air systems shall be balanced to deliver the quantities as specified or directed. The air balance shall be performed by an independent agency specializing in balancing and is certified by the National Environmental Balancing Bureau. 3. Prior to final acceptance by the Owners, all air and water systems shall be balanced to deliver the quantities as specified or directed. The air and water balancing shall be performed by an independent agency that has been obtained under a separate contract by the Department of Public Works. 4. Balance contractors main office shall be located within 50 miles from the project site. Approved balance contractors are Evolve Engineering, NWESI, Building Systems Technologies, and Blue-Sky Commissioning. All other contractors must receive prior approval from the Engineer, in writing, before bidding the project. 5. The Mechanical Contractor shall provide assistance to the Balancing Contractor by identifying all installed mechanical systems and assisting access to all installed mechanical systems. All mechanical systems shall be completely operational and functional prior to the Balancing Contractor performing their specified work
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cascade, ID
Bid Date: Sep 18 2024
Cascade, ID
Bid Date: Sep 24 2024
Cascade, ID
Bid Date: Jun 29 2023
Twin Falls, ID
Bid Date: Sep 18 2024
Post Falls, ID
Bid Date: Aug 22 2024
Boise, ID
Bid Date: Sep 13 2024
Pocatello, ID
Bid Date: Oct 07 2024
Boise, ID
Bid Date: Sep 19 2024
Twin Falls, ID
Bid Date: Sep 12 2024
Garden City, ID
Bid Date: Sep 25 2024
Salmon, ID
Bid Date: Oct 21 2024
Boise, ID
Bid Date: Oct 11 2024
Burley, ID
Bid Date: Sep 20 2024
Priest River, ID
Bid Date: Sep 17 2024
Nampa, ID
Bid Date: Oct 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
