Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

April 30, 2026

249 Glenwood Rd

Asbestos Abatement, Renovation, Site Work

No Information to Display

$3,900,000.00

Public - State/Provincial

img_map_placeholder

249 Glenwood Rd, Binghamton, NY

28

28

4

Subscribe to View Full Documents

DASNY is soliciting bids from Multiple Prime HVAC and Electrical Contractors for the following Scope of Work to be performed at the Broome Developmental Center. The project consists phased replacement of the existing Chiller equipment over the course of two winters. Phase 1 to be completed by April 30, 2025, and Phase 2 to be completed by April 30, 2026. HVAC CONTRACT Work in the HVAC Contract includes but is not limited to, the following: Phase 1: Asbestos Abatement & Hazardous Materials Abatement Perform hazardous materials abatement for the material types listed below, as detailed in the hazardous materials drawings. Environmental work shall be performed in conjunction with mechanical work for Phase. 1Ensure the environmental removals are coordinated prior to commencement of work. Surfaces determined to be coated with lead-based paint (LBP) or a lead coating (greater than 1.0 mg/cm2) in the first floor and basement to the phase delineation line on M-105. Materials identified to be coated with lead-containing paint (less than 1.0 mg/cm2). Materials identified to be asbestos-containing materials (ACM) on the first floor. Phase 2: Demolish and replace condenser water piping with CPVC schedule 80 piping (from the phase delineation in the basement refrigeration room to the cooling tower connections). Apply firestopping at interior piping penetrations as indicated in the mechanical drawings and per specification 078400 in addition to locations where asbestos abatement and/or hazardous materials abatement was per- formed and fireproofing was damaged or abated. Perform a rebuild to the two (2) cooling towers followed by an inspection as outlined by the original equipment manufacturer. Coordinate the storage of the new chillers during Phase 1. Provide proof of purchase of the two (2) new chillers prior to September 1, 2025. Assist commissioning agent as required. Hazardous Materials Abatement Perform hazardous materials abatement for the material types listed be- low, as detailed in the hazardous materials drawings within this drawing package. Environmental work shall be performed in conjunction with mechanical work for Phase 2. Ensure the environmental removals are co- ordinated prior to commencement of work. Surfaces determined to be coated with lead-based paint (LBP) or a lead coating (greater than 1.0 mg/cm2) in the basement to the phase delineation line on M-105. Materials identified to be coated with lead-containing paint (less than 1.0 mg/cm2). HVAC Demolish and replace six (6) pumps, two (2) chillers and associated refrigerant relief piping, and one (1) exhaust fan. All this equipment will be replaced per construction documents with new equipment, any changes required by code will be included in the updated equipment selections. Install new refrigerant relief piping and an extension to the existing exhaust air ductwork to provide a termination point at least 20 feet from any intake or window; remove and replace exhaust fan. Piping system accessories, such as chilled water air separator, expansion tank, side stream filter, and chemical feeder will be demolished and re- placed per construction documents. The chemical treatment system for the condenser water is existing to remain. A portion of the associated chilled water piping will be replaced, the piping will be re-applied with insulation as required per the insulation specification. All condenser water piping will be demolished and replaced with CPVC schedule 80 piping (from the phase delineation in the basement refrigeration room to the chiller connections). Apply fireproofing to locations where lead abatement was performed and fireproofing was damaged. Minority Owned Sub-Contracting Goal: 3% Women Owned Sub-Contracting Goal: 3% Service-Disabled Veteran-Owned Business Contracting Goal: 1%. Contract term: April 30, 2026. Location: Broome DDSO, 249 Glenwood Road, Binghamton, New York 13905. The scope of services of the HVAC contract includes but is not limited to installation of Building automation system, HVAC systems, equipment, instrumentation, and controls. The estimated construction cost for the HVAC Base Bid is between $3,600,000 - 3,900,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. If you have any questions concerning the Fair Play Act, please call the State Labor Department toll-free at 1-866-435-1499 or email us at: dol.misclassified@labor.ny.gov .

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects