Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 16, 2024

October 9, 2024

March 30, 2025

1390 Willow Rd

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

1390 Willow Rd, Winnetka, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Rooftop Unit Replacement. Bid Bond 10% Scope of Work The Village of Winnetka is accepting sealed bids from properly qualified firms to replace multiple rooftop A/C units and Unit heaters at the Public Works facility located at 1390 Willow Road. The current units have been in place since roughly 2000. These are all operational but require frequent repairs. The Village's goal is to systematically replace these units over a set period of years with the scope of this contract focusing on Phase I replacements only. M/WBE's are encouraged to participate in the bid process. Scope of Service: The Scope of Services shall contain the following items: Rooftop Unit Replacement Scope. A. Replacement of the following existing rooftop units: i. Unit #5 (Trane, 5-ton) ii. Unit #3 (Trane, 2-ton) iii. Unit #7 (Trane, 4-ton) B. Recover refrigerant from each existing unit and dispose of the refrigerant in an environmentally responsible manner in accordance the E.P.A. regulations. C. Provide the services of a crane company to lift off the old unit and set the new unit in place. D. Remove and properly dispose of the existing rooftop unit. E. Furnish, deliver and install one new Trane brand package heat/cool rooftop unit with equivalent capacity for each unit being replaced. F. Furnish and install one new factory-supplied outside air economizer. This device can provide significant energy savings, as they deliver free cooling, instead of running the compressors to create mechanical cooling, when the outside temperature is cool. G. Furnish and install transitional electrical material to connect to the existing electrical wiring presently installed above the roofline. H. Furnish and install transitional gas piping to connect the new unit to the gas pipe presently installed above the roofline. I. Start-up the new unit and check for proper operation. J. Secure any and all permits required per Local or State law, regulation or ordinance. Unit Heater Replacement Scope A. A Replacement of 10 Reznor overhead heating units located at spots to be designated. . B. Provide and operate the heavy-duty lift necessary to safely lower the old Unit Heater and raise the new one. C. Dismount the old Unit Heater, remove it from your premises, and properly dispose of it in an environmentally responsible manner. D. Furnish and install a new Unit Heater. E. Furnish and install transitional gas piping. F. Furnish and install transitional electrical connections. G. Furnish and install transitional flue piping

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.