Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$80,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Hollywood, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Building Waterproofing & Painting (Taft Street). Project Details Details Regarding This Scope of Work, Including Contractor Responsibilities, Technical Requirements, Term/duration, Etc., Are Available for Bidder's Review via Attachment a - Scope of Work. Bidders Are Expected to Review This Document in Full to Become Familiar With the Scope of Work. LOCATION OF SERVICES The services described in this solicitation shall be completed at the locations identified below: Location 1: 6363 Taft Street, Hollywood, FL 33024 Location 2: 6365 Taft Street, Hollywood, FL 33024 Question Deadline 09/11/2024 at 5:00 PM ET QD to Contact Person(s)*: To: KylaRedmond@semtribe.com Cc: BidSubmissions@semtribe.com Responses to this solicitation, in addition to all questions, inquiries, and communication, must be routed through: CONTACT PERSON Name: Kyla Redmond Email: To: KylaRedmond@semtribe.com Cc: BidSubmissions@semtribe.com Phone: (954) 966-6300 x11249 Scope of Work The Building & Grounds Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide waterproofing and painting services needed at the Seminole Tribe's Taft Street Buildings located outside of the Hollywood Reservation. Bidders must clearly disclose in their bids any known or expected use of subcontractors. Failure to make such disclosure at the time of bid may result in rejection of the subcontractor and the resulting agreement. The TRIBE reserves the right to reject any subcontractors which, in the TRIBE's sole opinion, are unfit to work on this project. PROJECT DETAILS CONTRACTOR shall perform the following: 2.1. WATERPROOFING: o CONTRACTOR shall pressure clean all exterior building surfaces except roof. Masonry, stucco walls, beams, columns, covered entry, trim, exterior ceilings, and soffits are to be pressure cleaned. Follow all recommendations in Section IX, part ii "Pressure Cleaning" and the attached Sherwin-Williams specifications (Attachment C - Sherwin Williams Specifications). o CONTRACTOR shall remove (and reinstall upon painting) all wall signage, fire extinguishers, awnings, and other removable items before working on walls. Items to be stored by the TRIBE once removed by CONTRACTOR and until reinstallation by CONTRACTOR. o CONTRACTOR shall examine the stucco for signs of cracking, separation from wall, or other damage. All loose or broken stucco must be removed and repaired/replaced. Particular attention should be paid to the six-foot-high (6') stucco band at the top of the buildings (from the top of the third-floor (3 rd ) windows to the top of the parapet wall). This area shall be visually and physically investigated around the entire perimeter of both buildings to verify if stucco is sound and uncracked. o BIDDER shall include the cost of a minimum of one-hundred-fifty square feet (150 sqft) of stucco removal and replacement in their bid for each building. o Any cracked stucco shall be repaired by CONTRACTOR per Paragraph 2.4.4. "Exterior Stucco Surfaces" and the attached Sherwin-Williams specifications (Attachment C). o Seal and prepare all stucco and masonry surfaces to be coated per Paragraph 2.4.4. "Exterior Stucco Surfaces" and the attached Sherwin-William specifications (Attachment C). o All existing caulking at doors frames, window frames, thresholds, penetrations, scuppers, drains, vents, and joints is to be removed and new caulk installed.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.