Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 24, 2024
October 17, 2024
October 17, 2025
2001 Brainard Rd
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - Federal
2001 Brainard Rd, Sierra Vista, AZ
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
JITC UPS maintenance and repairs. Site survey is scheduled for August 29. Please see site visit instructions attached. Please see all attachments for additional details. Service and maintain all CPS units, UPS systems, and DC Power Plants installed at the JITC Ft. Huachuca Campus. Details are provided in Tables 1 and 2. All UPS and DC Power Plant units will be maintained under one contract. The primary contractor shall be responsible for all tasks specified on this performance work statement (PWS). The Government may require surge support during the base or any option period, and surge modifications will be within the scope of the contract and provide increased support for the defined task areas of this PWS. Surge support over the life of the contract will not exceed 25 % of the contractor's total proposed cost/price for the base and all option periods, excluding any six-month extension of services pursuant to FAR 52.217-8. Place of Performance. The Contractor shall perform all work on-site at the Joint Interoperability Test Command, 2001 Brainard Road, Fort Huachuca, AZ, 85613. All work is conducted on secure Federal installation and un-cleared personnel must be escorted at all times. All questions from the site visit, must be submitted in writing to the Contracting Officer no later than two (2) working day after the site visit (September 3, 2024, at 4:00 pm Mountain). Period of Performance. The period of performance is a base year plus (4) 1-year options. As directed by the COR/ACOR, the contractor shall continue performance in emergency or mission essential conditions. Such as inclement weather Additionally, the contractor shall be required to account for the whereabouts of their personnel should this information be requested by the COR/ACOR.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sierra Vista, AZ
Bid Date: Aug 26 2024
Sierra Vista, AZ
Bid Date: Jan 19 2024
Sierra Vista, AZ
--
Sierra Vista, AZ
Bid Date: Nov 09 2023
Sierra Vista, AZ
--
Sierra Vista, AZ
Bid Date: Oct 13 2023
Sierra Vista, AZ
--
Sierra Vista, AZ
Bid Date: Oct 20 2023
Sierra Vista, AZ
Bid Date: Oct 27 2023
Sierra Vista, AZ
Bid Date: Oct 17 2023
Sierra Vista, AZ
Bid Date: Oct 27 2023
Sierra Vista, AZ
Bid Date: Aug 30 2023
Sierra Vista, AZ
Bid Date: Sep 12 2023
Sierra Vista, AZ
Bid Date: Aug 24 2023
Sierra Vista, AZ
Bid Date: Aug 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
