Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 18, 2024

No Information to Display

FM 2218 Rd

New Construction, Site Work

No Information to Display

$400,000.00

Public - County

img_map_placeholder

FM 2218 Rd, Richmond, TX

21

8

83

7

Subscribe to View Full Documents

Scope of Work of the Contract Documents includes the following: Construction of Lift Station Each Bid must be accompanied by a Bid bond or a certified or cashiers check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashiers check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashiers check within one (1) business day of receipt of the bid opening. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Boards judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Question Deadline 09/10/2024 at 2:00 PM CT All question must submit through Online. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Site Preparation Including Grading and Drainage; (2) Construction of 14-ft Diameter Wet Well; (3) Installation of Two Pumps with Piping, Hatches, and Appurtenances; (4) Installation of 10-in Diameter Force Main; (5) Installation of Emergency Diesel Generator; (6) Electrical Work; (7) Site Paving and Fencing; (8) Furnishing and Installing All Subsidiary Items as Necessary to Complete the Project; (9) Perform testing as specified on installed lines; and (10) Clean-up project area upon completion.

85 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.