Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

November 25, 2024

May 24, 2025

S Ridgewood Ave

Paving, Site Work

No Information to Display

$2,602,900.00

Public - State/Provincial

img_map_placeholder

S Ridgewood Ave, Port Orange, FL

56

7

3

4

Subscribe to View Full Documents

CONTRACT NO.: CAI11 Counties: Volusia Road Name: SR 5 (S Ridgewood Ave) Limits: At Spruce Creek Bridges and From N of Canal Rd to S of Ridge Blvd Project(s): 44708915201(*) Federal Aid No: D523066B Project(s): 44708915202 Federal Aid No: N/A Total Roadway Length: 0.842 Miles Total Bridge Length: 0.172 Miles Total Proposal Length: 1.014 Miles Contract Days: 180 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Please read the full advertisement Description: The Improvements under this Contract consist of two sections along SR 5 / US 1 in Volusia County from MP 23.200 to MP 29.399. The exception limits are MP 23.623 to MP 28.806. Section 1 is at the Spruce Creek Bridges, from MP 23.200 to MP 23.622. The improvements include milling and resurfacing, profile restoration at the bridge Approaches, guardrail replacement, and pavement markings. Section 2 is north of Canal Road to south of Ridge Blvd., from MP 28.807 to MP 29.399. The improvements include milling, resurfacing, converting on-street parking to dedicated bicycle lanes in each direction, ADA improvements, curb ramp upgrades, curb and sidewalk replacement, decorative signing, signing, pavement markings, and minor traffic signal improvements. Question Deadline 09/18/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 014 - Resurfacing - SR 5 (S Ridgewood Ave)

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.