Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 23, 2024
May 23, 2025
October 31, 2028
90 S Tippecanoe Dr
Asbestos Abatement, Demolition, New Construction, Site Work
No Information to Display
$98,674,544.00
Public - City
90 S Tippecanoe Dr, Tipp City, OH
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Build one (1) new 218,944 square foot PK-8 Elementary / Middle School to house 1,987 students. The building is to be constructed on a site situated between the existing Tippecanoe Middle School and L.T.Ball Intermediate School, on N. Hyatt St., Tipp City, OH. This will include the abatement and demolition of Nevin Coppock Elementary School, roughly 40,632 SF, prior to construction. The existing Middle School and L.T. Ball Intermediate School buildings will remain operational during construction. The project delivery method for this new school building will be Construction Manager at Risk. The building is required to achieve LEED Silver certification at a minimum and the school district has elected NOT to incorporate a storm shelter into the new building design. An early site package is anticipated for the PK-8 building and should be included as part of the AE basic services. Construction activities for the early site package are anticipated to start in April 2025. The main building GMP and Notice to Proceed is anticipated to be executed in October 2025 with a Substantial Completion date in October 2027. Professional Services Start: 10 / 24 Professional Services Completed: 10 / 28 EDGE Participation Goal Percent of initial Total A/E Fee: 5.0% Total New Elementary / Middle School Building Budget Cost: $79,678,986.15 ($67,567,513.93 Co-funded + $12,111,472.22 Project Agreement LFI). Project scope also includes work to renovate the existing 185,892 square foot Tippecanoe High School facility that currently houses 751 students utilizing the Construction Manager at Risk Delivery Method. Work is planned to be accomplished utilizing a multi-phased renovation operation to allow the facility to always remain in operation. Phasing and renovation plans have not been determined and will require extensive coordination and planning with the CMR firm. Work is anticipated to start in Summer 2026 with all phases of work being completed and full Substantial Completion reached by Summer 2027. Work is expected to be phased with most of the work done during summers of 2026 and 2027, with extremely limited swing space. Total Building Budget Cost: $13,939,887.72 ($10,608,289.26 Co-funded + $3,331,598.46 Project Agreement LFI) Provide A/E services for the buildings referenced above that are to be delivered via the Construction Manager at Risk and General Contracting delivery methods. Refer to the standard A/E Scope of Services for K-12 School Construction Manager at Risk (form M110-23.K12) and the standard A/E Scope of Services for K-12 General Contracting (form M110-13.K12) on the OFCC website
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Tipp City, OH
--
Tipp City, OH
--
Canton, OH
Bid Date: Oct 11 2024
Put in Bay, OH
Bid Date: Oct 04 2024
Brooklyn, OH
Bid Date: Oct 04 2024
Cincinnati, OH
Bid Date: Jul 30 2024
Elyria, OH
Bid Date: Sep 19 2024
Stow, OH
Bid Date: Oct 10 2024
Minster, OH
Bid Date: Oct 29 2024
Galloway, OH
Bid Date: Sep 16 2024
Painesville, OH
Bid Date: Sep 18 2024
New Philadelphia, OH
Bid Date: Aug 09 2024
North Canton, OH
Bid Date: Oct 04 2024
Cincinnati, OH
Bid Date: Sep 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
