Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

No Information to Display

1001 Sycolin Rd

Site Work

No Information to Display

$185,000.00

Public - City

img_map_placeholder

1001 Sycolin Rd, Leesburg, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Town of Leesburg is soliciting sealed proposals from interested offerors desiring to design, install, and operate a DCFC (Direct Current Fast Charger) Electric Aircraft Charging Station(s) at the Leesburg Executive Airport. The Town seeks offerors that demonstrate experience successfully developing, installing, and maintaining a network of Electric Aircraft Charging Stations. The successful offeror will be required to provide and operate a minimum of one single-port DCFC Electric Aircraft Charging Station capable of providing electric vehicle charging services to the public. Through this RFP, the Town intends to enter into a Lease Agreement for the development, installation, and operation of one or more Electric Aircraft Charging Stations at the Leesburg Executive Airport. Specifically, the purpose of this RFP is to solicit proposals for the development, installation, and operation of one single-port DCFC Electric Aircraft Charging Station at the Leesburg Executive Airport (the "Project") and further described in this RFP. The proposed installation should be located airside, compatible with both aircraft and electric vehicles, and fit for the aviation environment. The charging station should be Combined Charging Standard 1 (CCS1) Compliant and charging services shall be available for purchase by the public at a reasonable cost. The Offeror shall submit to the Town Attorney's Office one (1) original and one (1) copy of their Lease Proposal. Offerors shall submit with their Proposal all pages of the completed Proposal Submission Form herein. The Offeror shall make no other distribution of the Proposal. Lease proposal shall be submitted to: Town of Leesburg Attn: Town Attorney's Office 25 West Market Street Leesburg, VA 20176

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.