Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

November 4, 2024

June 27, 2025

Greenwood Dr

Paving, Site Work

No Information to Display

$158,654.00

Public - City

img_map_placeholder

Greenwood Dr, Burnsville, MN

28

16

5

Subscribe to View Full Documents

Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following work: 6,200 SF 4" Concrete Walk 350 SY Pavement Removal 250 CY Common Excavation 150 TON Aggregate Base, Class 5 40 TON Bituminous Pavement 305 SY 7" Concrete Driveway Pavement 1 EA Casting Assembly 2 EA Adjust Valve Box The bid bonds must be payable to the City of Burnsville in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The City of Burnsville reserves the right to reject any or all bids, to waive informalities, and to award the bid in the best interest of the City. No bids may be withdrawn for a period of sixty (60) days.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.