Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

June 1, 2025

No Information to Display

90 Washington St

Renovation

No Information to Display

$4,567,380.00

Public - City

img_map_placeholder

90 Washington St, Wellesley Hills, MA

86

22

40

5

Subscribe to View Full Documents

Warren Building, 90 Washington St. Wellesley, MA. Project scope includes: HVAC and fire alarm replacement, flat roof replacement, spatial reconfiguration in the BOH Suite, lighting replacement and associated plumbing, electrical, and finishes. Filed Sub Trades are: Roofing and Flashing, Acoustical Tile Ceilings, Painting, Fire Suppression, Plumbing, HVAC, and Electrical. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Bidders will be required to hold bids to 11/30/24 pending STM funding approval. Question Deadline 09/26/2024 at 11:00 AM ET All bidding Requests for Information (RFIs) shall be submitted online The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Replacement of the existing membrane roofing system. 2. New structural steel. 3. Interior painting 4. Framing, gypsum board, doors, window film, painting. 5. Carpet and flooring. 6. ACT ceilings 7. Attic blown-in insulation. 8. Replacement of dry sprinkler system and demolition of the existing system components. 9. Rework of existing wet sprinkler system 10. Replacement of hot water heater and demolition of gas-fired systems 11. Replacement of gas-fired kitchen ranges with induction units. 12. Replacement of existing HVAC system and demolition of gas fired systems. Ductwork cleaning. Installation of new air handling units, ductwork, piping, VRF system, automatic temperature controls, makeup air unit, exhaust fans, etc. 13. Removal and disposal of existing fluorescent lighting fixtures. 14. New LED lighting fixtures 15. Extension of conduit & wiring and reworking existing circuiting. 16. Complete fire alarm system replacement and demolition of existing fire alarm system components. 17. Site work for modifications to building entrances. 18. Targeted work in the bathrooms for MAAB adjustments. 19. Minor site work for MAAB adjustments.

47 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.