Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 9, 2024

April 8, 2025

2399 NW N River Dr

Demolition, Site Work

No Information to Display

$1,508,619.00

Public - County

img_map_placeholder

2399 NW N River Dr, Miami, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

SBE-S: 4% - Service Goal in the following recommended commodities: (NIGP 98852) Landscaping, ESTIMATED COST: $1,508,619.03 SCOPE OF WORK: The project consists of furnishing all materials, labor, and equipment necessary to upgrade Sewage Pump Station No. 077, including, but not limited to, providing uninterrupted by-pass pumping capabilities for the existing pump station flow during all construction times and until the new pump station is completely operational and accepted by the Owner; demolishing and removal of the existing dry well / wet well top slab, frame & cover and removal of all existing equipment inside the structures including, but not limited to the following: the existing dry/wet well, pumping equipment and appurtenances, piping and fittings, conduits, and all other items deemed necessary to be removed; filling the dry well portion of existing structure with flowable fill and abandon in place; Convert wet well portion of structure to receiving manhole by creating new floor slab with flow channel and install gravity sewer piping; removal of existing controls slabs, equipment, vents, piping and appurtenances; site preparation, clearing and grubbing as necessary; furnishing and installing a new WASD standard 8' (inside) Dia. concrete wet well with flood resistant aluminum access hatch and 10-inch internal discharge piping, valves, fittings, and appurtenances; furnish and install two new submersible pumps; furnish and install new WASD standard concrete valve vault, with flood resistant aluminum access hatch and 10-inch internal discharge piping, valves, fittings, and appurtenances. The Pump Station is located within the NW North River Drive Right of Way; directly adjacent to Gerry Curtis Park, which is owned by the City of Miami. The RFI cut-off date is five (5) business days prior to the bid due date. Email the Contracting Officer or paul.adams@miamidade.gov for further information or to schedule training on alternative dates.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.