Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Sparta, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. If a bidder is not selected within sixty (60) days of the bid opening, any bidder that is determined by the OWNER to be unlikely of being selected for contract award shall be released from their bid. providing field investigation of water service lines and inventory documentation services in conjunction with implementation of Lead and Copper Rule Revision (LCCR) Compliance related to Lead Service Line Inventory and Replacement Program in accordance with the revised United States Environmental Protection Agency (USEPA) Lead and Copper Rule. The Project consists of, but is not limited to the following major elements: Field investigation of water service lines on the City-side and Customer-side of water meters and field verification of service line materials. Field investigation may include but nonlimited to, visual observation within the meter box, pot holing or excavating near the meter box on both the City-side and Customer side of the meter. The contractor shall be responsible for restoration of the property immediately after the service line materials are identified. Where service lines are located beneath paved surfaces, the contractor will be responsible for cutting and restoring pavements of various types.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.