Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

August 17, 2025

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Due West, SC

29

21

2

2

Subscribe to View Full Documents

Th scope of this project includes, but is not limited to, the following: Installation of approximately 9,810 LF of 8" DI and 5,760 LF of 6" DI waterlines with misc. appurtenances including (28) fire hydrants in Due West, SC. Included above is 1,780 LF of directional drill and 240 LF of jack and bore. The work is divided into a Base Bid with three (3) add alternates. As of August 20, 2024, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. Question Deadline 09/12/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. SCOPE OF WORK A. Provide and pay for field surveying and engineering services required for the Project. 1. Survey work required in execution of the Project. 2. Civil, structural or other professional engineering services specified, or required to execute Contractor's construction methods. B. Retain the services of a professional land surveyor licensed in the State of South Carolina to: 1. Identify existing vertical and horizontal control points and property line corner stakes indicated on the Drawings, as required. 2. Verify all existing structure locations and all proposed building corner locations, tank and equipment locations. Verify top of wall and floor elevations of existing structures including invert elevations for existing sanitary and storm manholes and drainage inlets. Verify existing electrical, instrumentation, and telephone utilities. This information, and any variations noted during construction, shall be incorporated on the As-built drawings. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects