Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

October 9, 2026

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Denver, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Contractor shall be responsible for providing full-service fire alarm, fire sprinkler and security system maintenance, testing, repair, inspection services and emergency call services 24 hours per day 365 days per year. Contractor shall provide all supervision, labor, material, equipment, tools, replacement parts, chemicals, transportation, and all effort necessary to complete the scope of work. RTD sends responses to written inquiries:August 28, 2024, 2:00pm This Contract has the potential for two (2) 1-year options to extend the Period of Performance. RTD has not specified a DBE/SBE participation goal for the Work to be performed under the Contract. However, RTD encourages and expects proposers to pursue subcontracting, mentoring, joint venturing, teaming and partnering opportunities with DBE/SBE firms in the ordinary course of its business/teaming strategies. To date, RTD has achieved greater than 20% DBE/SBE participation on its overall FasTracks DBE/SBE Program. Proposers are encouraged and expected to create a level playing field to the maximum practicable extent consistent with the objectives and requirements of the RTD DBE/SBE program based on federal regulations codified at 49 CFR Part 26 and RTD's SBE/DBE Program Policy. Subject to the Termination provision of the Contract, performance shall commence as of the date specified in the notice to proceed or, if no date is specified, upon Contractor's receipt of notice to proceed, and shall continue for 3 years (subject to the exercise of option periods, if any). If mailed, receipt of the notice to proceed is presumed to be five days after mailing. Proposals shall be valid for a duration of no less than ninety (90) days from proposal due date.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.