Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 14, 2024

November 1, 2025

33 Allegiance Cir

New Construction, Site Work

No Information to Display

$315,000.00

Public - City

img_map_placeholder

33 Allegiance Cir, Evanston, WY

15

17

3

Subscribe to View Full Documents

**As of September 24, 2024 project was awarded to Sci Inc. but awarded amount is not available.** The Project includes the following work: * 1,700 feet of 8"" fused HDPE pipe * Valves and miscellaneous fittings * Connection to existing structures Owner anticipates that the Project's total bid price will be approximately $315,000.00. The Project is expected to be substantially complete by November 1, 2025. Information and Bidding Documents for the Project can be requested from: Taylor Kofoed, J-U-B Engineers tkofoed@jub.com 307-660-3621 The designated contact will be periodically sending addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other. Bidding Documents will be offered only through the designated contact. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated contact. The Owner reserves the right to waive any informality or to reject any or all Bids. Each Bidder must deposit with his Bid, a bid security subject to the conditions provided in the Instructions to Bidders. Wyoming Contractors and suppliers will be given a 5% preference in bidding. No Bidder may withdraw his Bid within thirty-five (35) days after the date of the opening thereof. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 09/05/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Taylor Kofoed, (307)660-3621, tkofoed@jub.com

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.