Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

November 20, 2027

10710 FM1660

Paving, Renovation, Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

10710 FM1660, Hutto, TX

1035

53

84

6

Subscribe to View Full Documents

Work of the Project generally includes expansion of the Hutto South WWTP. More specifically, the Work includes, but is not limited to, construction of the following 1. Facility 5, Site Civil Improvements: a. Site improvements including yard piping, grading, drainage, paving and stormwater management. 2. Facility 10, Headworks Improvements: a. Cast-in-place headworks structure with coarse (6mm) screening, bypass, and grit removal. b. Electrical room for headworks equipment. c. Screening and grit collection and storage. 3. Facility 15, Odor Control Improvements: a. Installation of a bio scrubber, ventilation fans and exhaust system for the influent lift station, headworks, and primary clarifier facilities. 4. Facility 16, 17 and 18, Primary Clarifier Improvements: a. Installation of a primary clarifier splitter box and two (2) primary clarifiers with spiral rake sludge collection system, scum pumping and primary solids pumping station. 5. Facility 19, 20 and 30, Process Train Improvements: a. Installation of two (2) common wall biological process basins with anaerobic, anoxic, and aerobic (A2O) treatment zones. 1) Basins will have mixers, baffling, aeration diffuser grids and internal mixed liquor recycle system with axial flow pumps. b. Process Trains will have an integral mixed liquor splitter box to distribute flow to the downstream clarification process. c. Installation of an independent process basin splitter box structure. The scope of this work package consists of the turnkey contruction and start-up of the tertiary filters (area 50), flow meter vault (area 54), uv, post aeration, and effluent metering (area 55), and non-potable water storage (area 70), less architectural, and as further described within the package inclusions and exclusions. Previously purchased equipment for this package is as follows: 40 23 46 - slide & sluice gates - rw gate 44 42 19.2 - multi-stage centrifugal blowers - lonestar 44 43 43 - ultraviolet weir troughs - nefco 44 44 73 - ultraviolet disinfection system - trojan 44 45 19 - post aeration - ssi aeration 44 42 56.23 - vertical turbine pumps - patterson 44 42 64 - weirs and baffles - nefco 44 42 64.13 - finger weir pans - nefco 44 61 00 - automated backwashing filters - tekleen 44 61 15 - synthetic media disk filter - aqua aerobics Work of this Project generally includes expansion of the Hutto South WWTP. More specifically, the Work includes, but is not limited to, construction of the following: Facility 5, Site Civil Improvements: Facility 10, Headworks Improvements: Cast-in-place headworks structure with coarse (6mm) screening, bypass and grit removal Electrical room for headworks equipment Screening and grit collection and storage Facility 15, Odor Control Improvements: Installation of a bioscrubber, ventilation fans and exhaust system for the influent lift station, headworks, and primary clarifier facilities. Facility 16, 17 and 18, Primary Clarifier Improvements: Installation of a primary splitter box and two (2) primary clarifiers with spiral rake sludge collection system, scum pumping and primary solids pumping station. Facility 19, 20 and 30, Process Train Improvements: Installation of two (2) common wall biological process basins with anaerobic, anoxic and aerobic (A2O) treatment zones. Integral mixed liquor splitter box to distribute flow to the downstream clarification process. Installation of an independent process basin splitter box structure. Facility 25, Aeration Blower Improvements: Installation of a new blower building with process air blowers and electrical & HVAC equipment. Facility 35 and 40, Secondary Clarifier Improvements: Installation of two secondary clarifiers with spiral rake sludge collection system. Installation of a RAS/WAS pump station and piping. Facility 45, Chemical Feed Improvements: Installation of Alum and sodium hypochlorite feed and storage equipment. Facility 50, 55, and 70, Tertiary Treatment Improvements: Installation of cloth media filters, UV equipment, non-potable water pump station, post aeration and effluent monitoring facilities. These facilities will be installed in common wall basins with an attached electrical building to house electrical equipment for these systems. Facility 60, 62, 64, and 65, Biosolids Improvements: Installation of a new biosolids building with two (2) new centrifuges, solids storage, polymer feed facilities and electrical gear for the equipment. Installation of a new centrifuge pump station with progressive cavity pumps to transfer biosolids from the AHSB to the biosolids building. Conversion of the existing sequencing batch reactor system to allow the basins to be used as aerated sludge holding basins. Rehab of the existing aerated sludge holding tank and belt filter press facilities to improve the performance of the existing gravity thickener and belt filter press. Electrical and SCADA Improvements: Install electrical improvements as required to power the facility. Install backup power generators. Install new transformers and site service. Install new electrical buildings to house power equipment. Install SCADA Improvements. The deadline to ask questions is 9/18/2024 3:00 PM CDT

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects