Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

October 10, 2024

July 31, 2026

Arcola Rd

Site Work

No Information to Display

$1,952,338.00

Public - County

img_map_placeholder

Arcola Rd, Fort Wayne, IN

57

4

17

6

Subscribe to View Full Documents

Project #2366-5342-90 Arcola Road and Drainage Improvements This work shall consist of the installation of watertight service connections on all proposed pipe that connect existing storm sewer tap connections to proposed interception tiles, as indicated on the plans. This work shall consist of the installation of inlet, yard drains, as indicated on the plans. This work shall consist of the installation of pipe, plug existing and associated work and incidentals for performing the work as indicated on the plans. This work shall consist of the construction, reconstruction, or adjustment to grade of sanitary manholes. This work shall consist of the construction of sanitary sewer laterals in accordance with the plans installed via open cut installation. This work shall consist of providing bypass pumping and/or bypass flow for the existing storm sewer as necessary to complete the work as indicated in the drawings and/or as directed by the Owner and/or Engineer. This work shall consist of the crushing or cutting open the existing pipe, filling voids and compacting with structure backfill type 1, and backfilling the resulting trenched, holes, and pits as required to complete to work as indicated in the drawings. This work shall consist of the installation of wooden fencing as shown on the plans and specified herein. The work shall consist of the installation of a toe wall for the 48" outfall at the Manier Ditch as indicated in the drawings, including an anchor strap. This work shall consist of the installation and maintenance of temporary erosion control measures as shown on the plans and specified herein. The contractor shall provide and maintain methods, equipment, and temporary construction as required to control conditions at the Site and adjacent areas. Contractor shall maintain all controls until Contractor warranty period is complete, or until controls are no longer needed, whichever is earlier. Upon completion of the Work, remove temporary controls and restore Site to specified condition; if condition is not specified, restore Site to pre-construction condition. This work shall consist of the installation and maintenance of temporary traffic control devices as show on the plans and specified herein. This work shall consist of the installation of cured-in-place pipe (CIPP) as shown on the plans and specified herein.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.