Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 27, 2024

September 30, 2024

March 1, 2025

40 Springer Rd

Site Work

No Information to Display

$3,536,750.00

Public - County

img_map_placeholder

40 Springer Rd, Ligonier, PA

78

23

12

4

Subscribe to View Full Documents

As of September 20, 2024, this project has not yet been awarded. The project is expected to be awarded on September 24, 2024. Ligonier Valley High School Baseball Field Reconstruction Project. A Pre-bid Conference Will Not Be Held. This Project is Subject to the Pennsylvania Prevailing Wage Act, Approved August 15, 1961, P.l. 987 (Act No. 442), as Amended and Supplemented, and Reference is Made to the Prevailing Minimum Wage Rates Applicable to This Project Which Have Been Promulgated by the Secretary of Labor and Industry. The Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Gender, Creed, Color, Sexual Orientation, Gender Identity or Expression, or in Violation of the Pennsylvania Human Relations Act and Applicable Federal Laws, Against or Intimidate Any of Its Employees. All Materials Used on the Project Shall Meet the Buy America Act and the Pennsylvania Steel Procurement Act. The Ligonier Valley School District Reserves the Right to Reject Any or All Bids or Items Therein, or to Waive Any Irregularities in the Same. Proposals Will Be Received for the Following Prime Contracts: General Construction, Mechanical Construction, Plumbing Construction, and Electrical Construction. Successful Bidders Will Be Required to Enter a Contract With Ligonier Valley School District Requiring a Labor and Material Payment Bond, Maintenance Bond and Performance Bond in the Amount of Onehundred Percent (100%) of the Contract Sum. Work Will Consist of Furnishing and Installing All Labor, Materials, and Equipment to Reorientate, Reconstruct and Regrade the Baseball Field. The Project Will Also Include, but Not Limited to: New Fencing, Retaining Walls, Bleachers, Site Work, Back Stop, Utilities, Dugouts, Bull Pens, Maintenance Area, Erosion and Sediment Pollution Control, Retention Basin, Field Drainage, Field Irrigation, Construction of Field Surface (Sod, Infield Mix, Warning Track, Home Plate, Bases, Pitchers Mound, Striping, Etc.), Score Board, Press Box/restrooms, Pavilion, Batting/pitching Practice Building and a Building Addition on the Back Side of the Existing High School. Etc. Complete in Place. document notes. Only Digital Pdf Copies of the Contract Documents Will Be Provided, Prospective Bidders Will Be Responsible for Printing All Contract Documents. Addenda, if Any, Will Be Issued to Only Bid results General - Straw Construction Co , Inc. $3,401,000.00 Mechanical - MARC Service $12,500.00 Plumbing - Darr Costruction, Inc. $36,250.00 Electrical - Merit Electrical Group, Inc $87,000.00

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.