Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

November 8, 2024

1404 W Weber Ave

Site Work

No Information to Display

$435,688.00

Public - County

img_map_placeholder

1404 W Weber Ave, Stockton, CA

46

14

7

4

Subscribe to View Full Documents

The Project consists of the construction of three (3) concrete pads totaling 432 square yards, including excavation, subgrade preparation, forming, and reinforcement, for the permanent storage of stoplogs and racks. The work also includes transporting of the stoplogs from a storage site in Tracy, California, to the project site and onto the newly constructed pads. Bidders shall be skilled, regularly engaged and licensed in the general class or type of work specified and possess a valid California Class "A" Contractor's License. In accordance with the provisions of the State of California Labor Code 1770 et seq., the Director of the Department of Industrial Relations (DIR) has ascertained the general prevailing rate of wages applicable to the Work to be done. Bidders shall be registered with the DIR pursuant to Labor Code1725.5 to be qualified to bid on or engage in the performance of work under this Contract. These requirements extend to all Subcontractors to be listed on a bid proposal or engage in the performance of work under this Contract. This contract is subject to the California Air Resources Board Off-Road Diesel Regulation (Title 13 CCR 2449). The successful bidder will be required to submit copies of the valid Certificates of Reported Compliance for the fleet selected to perform work for this bid and any listed subcontractors. The bid shall be accompanied by a Bid Guarantee of not less than ten (10) percent of the Base Bid Amount. Technical, construction, and Project inquiries and questions should be directed to Joseph Prescott (Jprescott@ksninc.com) or David Carr (dcarr@ksninc.com) at (209) 946-0268 Estimated cost of project construction is $500,000. for the Stoplog Storage Foundation for the Smith Canal Gate Project Bids will be received for a single prime Contract. Bids shall be on a unit price basis. Award will be based on lowest price of the base bid items.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects