Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 3, 2024

June 4, 2025

November 5, 2025

Multiple Locations

Site Work

No Information to Display

$1,586,000.00

Public - City

img_map_placeholder

Multiple Locations, Longueuil, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number: 20012386 Deadline for receipt of complaints 2024-08-19 Electronic tender submission accepted Yes, via SEAO, with a document Expected contract duration without options (in months) 52 Description of requirements/works: The works under this contract are planned in two (2) phases. The first phase involves work to expanding the settling basin at the waste snow disposal site at 2950 Chemin Du Tremblay. The work to be carried out includes, but is not limited to, the following: - Construction of a settling basin; - The storm water pipe connections (+-90m); - Installation of a flow regulator; - Decommissioning of existing effluent pipes and structures; - The construction of access roads for the circulation of machinery in the settling basins for their maintenance; - Development of embankments along the site; - Restoration of surfaces and restoration of the site. The second phase concerns work to divert effluent from the decantation basin on the same site. The work to be carried out includes, but is not limited to, the following: - Construction of a storm sewer network to divert effluent from the site's basin (+- 600m); - Relocation of the flow regulator installed in phase 1; - Decommissioning the existing effluent pipes; - Reconstruction of the foundation and paving at the site entrance; - Reconstruction and restoration of the site to its original state.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects