Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

March 6, 2025

8500 5th Ave

Site Work

No Information to Display

$27,684.00

Public - County

img_map_placeholder

8500 5th Ave, Oak Creek, WI

5

7

6

7

Subscribe to View Full Documents

Grit Pump Repair at South Shore Water Reclamation Facility. Description: The project contemplated consists of repairs to the Hayward Gordon XR4(8) Submersible Pump, Serial No. 33484-1, at SSWRF. The work for this project includes, but is not limited to, the following: o Transportation of the pump from SSWRF to the selected contractor's facility o Disassembly of the pump and inspection of the pump o Preparation of a pump inspection report o Removal of the defective parts o Furnishing and installation of replacement parts o Preparation of a pump repair report o Shipping of the repaired pump back to SSWRF Question Deadline 08/20/2024 at 10:00 AM CT Online. All questions must be in writing to: Millie Neidhardt Procurement Specialist Eneidhardt@mmsd.com.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.