Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

$2,500,000.00

Public - City

img_map_placeholder

To Be Determined, Montgomery, AL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

"The scope of works is the following: 16,000 CYIP 12"" Compacted Clay Liner (Off-Site) 16,600 CYIP 12"" Sand Drainage Layer (Off-Site) 434,530 SFIP 60 mil HDPE Geomembrane (Textured) 434,530 SFIP Geosynthetic Clay Liner (Reinforced) 434,530 SFIP Double Sided Geocomposite Drainage Net 50,940 SFIP 8 oz/SY Non-Woven Geotextile 820 LF 8"" Dia. Leachate Collection Pipe (Perforated) 54 LF 8"" Dia. Leachate Cleanout Pipe (Solid) 3,765 TON Gravel for Leachate Cleanout Pipe (Solid). The bracket cost is $2,000,000.00 to 2,500,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The bracket range is shown to provide general financial information and should not be used in preparing a bid. The time of completion is ninety (90) calendar days from the date all submittals are approved. Pre-qualification packages may be obtained at the office of CDG, Inc., 11 West Court Square Andalusia, Alabama 36420. Pre-qualification applications for the construction of North Montgomery Landfill Cell 11 Liner Construction will be received from Prospective Bidders by CDG, Inc. Andalusia, Alabama, until 4:00p.m., Monday August 26, 2024. Prospective bidders will be notified of approval to bid no later than 4:00p.m., Tuesday, September 3, 2024. The City of Montgomery adopted Resolution 63-2021, an administrative plan for a 30% minimum participation goal of disadvantaged, minority, and women owned business enterprise for public works projects. The resolution is included in the bid documents for contractors to review and acknowledge review by signing Exhibit A. The successful bidder is required to carry Workman's Compensation Insurance and Public Liability Insurance, and if a subcontractor is employed, Contractor's Contingent Liability Insurance. Bidders are required to file with a certified check or bid bon through a surety company authorized to do business in the State of Alabama; either form is made payable to the City for an amount not less than 5% of the City's estimated cost or of the contractor's bid but in no event more than $50,000.00 Bidders are hereby notified that all provisions of Section 80, Act No. 571 Regular Session of June 19, 1959, approved November 19, 1959, "An Act to Regulate the licensing of General Contractors" shall be strictly observed. Also, it is necessary for persons submitting bids for involving $50,000.00 or more to show satisfactory evidence as a general contractor. A bond in reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contracts prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. The City reserves the right to accept or reject any and all bids and waive technicalities.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.