Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2024

October 28, 2024

June 25, 2025

To Be Determined

Site Work

No Information to Display

$673,893.00

Public - City

img_map_placeholder

To Be Determined, San Luis Obispo, CA

35

22

6

Subscribe to View Full Documents

The Project consists of equipping a production well, constructing a new booster pump station, installing electrical conduit, and installing a conveyance pipeline from the well to the existing water system infrastructure, as described and implied in the Contract Documents. The work generally includes: mobilization; site preparation; trenching; furnishing materials for project; site wiring and controls installation, submittal and document preparation; compliance with regulatory requirements; surveying; temporary facilities; site maintenance, safety and security; testing; demobilization; and all labor, equipment, and incidentals required, to construct a ready for operation equipped well, booster station, and conveyance pipeline. Questions regarding the Bidding Documents shall also be directed to Kendall Houghton. The deadline to ask questions is 12:00 pm local time August 19, 2024. Bidders are notified that funding for this project is provided by the California Department of Water Resources through the Small Community Drought Relief Program and pursuant to the Budget Act of 2021 (STATS. 2021, CH. 240, 80). Bidders are notified that labor code compliance is required which includes all provisions regarding prevailing wages. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects