Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2024

September 27, 2024

February 24, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$507,022.00

Public - City

img_map_placeholder

Multiple Locations, Fulton, MO

17

10

2

3

Subscribe to View Full Documents

2024 Storm Water Detention & Street Construction Contractor is required to meet ARPA specifications. The work includes the construction of approximately 725 feet of street, & a Detention Pond of 30,400 sq. ft. in the city limits of Fulton Missouri. This project consists of providing the labor, materials, to install a Detention Basin and Street Project. The City of Fulton anticipates issuing notice to proceed in the fall of 2024 completion will accommodate pavement work in spring 2025. All work within public right of way shall be, in compliance with the Missouri Standard Specifications of Highway Construction. The Instructions to Bidders, Bid Proposal Form, Contract for Public Work form, Plans, Specifications, Bid Bond, Performance and Payment Bond forms, and other contract documents may be examined at the following locations: ATTN: Missouri,4500 Lake Forest Drive, Suite 502, Cincinnati, OH 45242 Builders Assn. of Missouri, 3632 West Truman Blvd., Jefferson City MO 65109 Reed Construction Data, 30 Technology Parkway South, Suite 500, Norcross, GA 30092-2912 Missouri Plan room, 78 Weldon Parkway, Maryland Heights, MO 63043 City of Fulton, City Hall, 18 East Fourth. St., Fulton, MO 65251 Copies may be obtained at the office of The City Engineer, City of Fulton, 18 W. Fourth St., Fulton, Missouri 65251, upon payment of a $25.00 nonrefundable fee for each set. Description. Portland cement concrete shall consist of a mixture of Portland cement, fine aggregate, coarse aggregate, and water combined in the proportions specified for the various classes of concrete. Admixtures for the purpose of entraining air, retarding or accelerating the set, tinting and other purposes may be added as specifically required or permitted. Section 230 addresses Portland cement concrete to be used for used for pavement, curb and gutter, sidewalk, steps, and driveways. Section 250 addresses Portland cement concrete used for drainage structures, retaining walls, and any special concrete structures.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.