Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

November 25, 2024

August 22, 2025

I-470

Site Work

No Information to Display

$1,698,000.00

Public - City

img_map_placeholder

I-470, Lees Summit, MO

8

25

4

Subscribe to View Full Documents

The Work for the project includes, but is not necessarily limited to: Installing 460 linear feet of 12" gravity pipe, including 350 linear feet of jack and bore under I-470 of 24" steel casing pipe. Work will include installing new pipe and appurtenances and restoration of worksites. Question Deadline 09/18/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Electronically to Harry Grewal, Staff Engineer, at Harry.Grewal@cityofls.net SCOPE OF WORK A. It is the intent of this coverage to accurately, clearly document, and define pre-existing, postconstruction, and/or construction conditions to minimize potential construction claims. B. Contractor shall provide to Owner one copy of a high quality color audio and video recording of the existing surface conditions within the projectís zone of influence. The zone of influence shall be defined as an area within a temporary construction easement or public right-of-way, as indicated by the Drawings, or within 35 feet of the proposed Work. C. The following recording(s) shall be completed: 1. Prior to any construction activity, the video of existing conditions described in Paragraph 1.01.B above. 2. Alignment, grade, and visible defects of sanitary sewer lines and/or manholes installed as part of the work shall be inspected by closed circuit television in accordance with Specification Section 3500.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.