Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2024

September 27, 2024

June 1, 2026

Multiple Locations

Paving, Site Work

No Information to Display

$466,499.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Harbor Springs, MI

9

10

2

4

Subscribe to View Full Documents

DESCRIPTION OF WORK: Remove the existing timber bridge and replace with new fiberglass superstructure with glued-laminated pile cap supported on helical anchors including approach embankment and edging, riprap and slope restoration. The site is located in Wawatam Township, Emmet County, T39N R4W Section 32, as shown on the Drawings. File No. 751/22371.ABG Substantial Completion: December 1, 2025 Final Completion: June 1, 2026 All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to: Amanda Porath, PE at amanda.porath@ohm-advisors.com. Questions will be accepted until August 23, 2024 at noon ET.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects