Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 9, 2024

September 15, 2024

December 31, 2024

Multiple Locations

Site Work

No Information to Display

$541,250.00

Public - Federal

img_map_placeholder

Multiple Locations, Brooklyn, MS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

55

Subscribe to View Full Documents

All work to be performed under the awarded contract will be in accordance with requirements, including specifications and drawings provided for this project. Project Title(s): Ashe Nursery and Big Biloxi Waterline Replacement Original Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS :237110 Water and Sewer Line and Related Structures / PSC Z2FB Repair Or Alteration Of Recreational Buildings $45M This is a Invitation for Bid (IFB) will result in award of a firm-fixed price contract. Award will be made using a Lowest Price responsive/responsible evaluation. Magnitude: (d) Between $250,000 and $500,000. Location(s): This potential contract has two work packages in two locations: Attachment 001, Work Package 001 Ashe Seed Extractory, 368 Ashe Nursery Road, Brooklyn, MS 39425 (FOREST COUNTY, MS); Attachment 002, Work Package 002 Big Biloxi Campground, 19595 Desoto Park Rd, Saucier, MS 39574 (HARRISON COUNTY, MS) Scope of Work (summarized): Attachment 001, WORK PACKAGE 001 Ashe Seed Extractory -Installation of approximately 9200 LF of 4" HDPE watermain, Installation of HDPE piping to serve six buildings and two yard hydrants and associated appurtenances; Plumbing twenty-one fixtures in six buildings;Installation of pump assembly (Grundfos CMBE twin), one 35-gallon expansion tank, associated 4" stainless steel piping and pipe appurtenances, electrical panel, 6" thick concrete slab, and insulated aluminum enclosure as shown on plans; Connections to existing watermains, pressure testing, and water quality testing. Attachment 002, WORK PACKAGE 0002 Big Biloxi - Installation of approximately 2,650 LF of 4" HDPE watermain; Directionally drill approximately 100 LF of 4" HDPE watermain; Installation of water meter and pressure reducing valve with concrete vaults; Connections to existing watermain, pressure testing, and water quality testing. SCHEDULE: SITE VISIT: 8/15/2024; Time: 10:00 CT; Location: Ashe Seed Extractory, 368 Ashe Nursery Rd, Brooklyn, MS 39425 POC: Scott Leonard or Matthew Gong , 479-438-9387, scott.leonardusda.gov; matthew.gongusda.gov LAST DAYF OR QUESTIONS:0 8/31/2024 BIDS DUE: 09/09/2024 120CT PERIOD OF PERFORMANCE: NTP 90 Days (negotiable) Submittal Method:A ll bids will be emailed to steven.alvesusda.gov; cc: cynthia.grandersonusda.gov. You may call 859-334-0524 to confirm receipt. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (30.0%), WBE (6.9%), SBE (100%)

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.