Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2024

October 11, 2024

November 22, 2024

Multiple Locations

Site Work

No Information to Display

$203,580.00

Public - City

img_map_placeholder

Multiple Locations, San Fernando, CA

1

9

7

2

Subscribe to View Full Documents

The work includes replacement of concrete sidewalks, drive approaches, wheelchair ramps; AC pavement sections, adjustment to grade of water meter boxes and traffic signal/streetlighting boxes; removal and relocation of bus benches, root pruning, installation of bus shelters and bus benches, and miscellaneous appurtenant work. The construction cost is estimated to be $259,600. In order to be eligible to submit a bid for the project, you MUST contact Kenneth Jones, MPA, Administrative Analyst, via e-mail at kjones@sfcity.org to be placed on the plan holders list. Bids will be accepted only from contractors licensed in accordance with the provisions of the Business and Professional Code of the State of California. Prior to contract execution, the Contractor and his/her subcontractors shall obtain a City business license. At the time of bidding, the Contractor must possess a valid California Class C-8 or Class A Contractor's License. The Contractor must follow the procedures as set forth in the Instructions to Bidders for acceptance of bids. Bids will be accepted only if submitted on a proposal form furnished by the City. Each bid must be accompanied by cash, certified check, cashier's check, or bidder's bond made payable to the City of San Fernando or issued by a surety admitted to do business in California, for an amount equal to at least ten percent (10%) of the amount bid. Such guaranty to be forfeited to the City should the bidder to whom the contract is awarded fail to enter into the contract. A DBE goal of 13.52% has been established for this contract. Question Deadline 08/08/2024 at 4:30 PM PT Questions pertaining to the project shall be submitted in writing to Kenneth Jones, Public Works Management Analyst, (KJones@sfcity.org). The contract time for the project is Thirty (30) working days. The contractor will be given sixty (60) calendar days for the procurement of the bus shelters and benches, after the City authorizes the Notice to Procure. The City reserves the right to reject any and all bids and to waive any minor irregularities in the bid documents. Bidders may not withdraw their bid for a period of ninety (90) days after date set for opening thereof.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.