Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 29, 2024

October 7, 2024

November 15, 2024

114 W Washington St

Paving, Site Work

No Information to Display

$152,644.00

Public - City

img_map_placeholder

114 W Washington St, New Castle, PA

4

9

3

Subscribe to View Full Documents

The base bid includes concrete curb, permeable pavers, fencing, and plantings. This work will be performed under one (1) general contract. Each proposal must be accompanied by a certified check or bid surety bond in the amount of ten percent (10%) of the price of the bid, which sum shall be specifically set forth in the surety bond with a reference to the specific bidding document, as a guarantee that if the proposal be accepted a contract will be entered into and its performance properly secured. The City of New Castle reserves the right to reject any or all proposals and to make such award as most advantageous to the City. WORK LIMITS, MEASUREMENTS, AND QUANTITIES BASE BID: All work will be contained between the sidewalk on East Washington Street, Apple Alley, the existing building and the unnamed asphalt alley behind the vacant lot: 1. Landscape Block = 75 L.F. 2. Fencing = 155 L.F. 3. Permeable Pavers = 1,740 S.F. 4. Bollards = 14 EA 5. "Hearts of Gold" Planting = 4 EA 6. "The Rising Sun" Planting = 1 EA 7. Ilex Gabra "Densa" Planting = 12 EA 8. Hydrangea Panticulata "Bobo" = 30 EA 9. Double Knock Out Roses = 30 EA 10. Dog Park Surface = 1,700 S.F. 11. Topsoil = 34 C.Y. 12. Decorative Landscape Stone = 480 S.F. 13. Hydroseeding = 1,760 S.F. 14. Plain Cement 18" Concrete Curb = 100 L.F. 15. Water Fountain (Install Complete) = 1 L.S. 16. Benches = 2 EA

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects