Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2024

September 2, 2024

October 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,258,361.00

Public - City

img_map_placeholder

Multiple Locations, Bridgeview, IL

32

7

14

4

Subscribe to View Full Documents

2024 Street Resurfacing DESCRIPTION OF WORK: Earth excavation, HMA surface removal; curb and gutter removal and replacement; sidewalk removal and replacement; structure adjustments; HMA surface course replacement; topsoil and sod; and all appurtenant construction at various locations throughout the Village. Only qualified Contractors who can furnish satisfactory proof that they have performed work of similar nature as Contractors will be entitled to receive Bid Documents and submit Proposals. To meet this requirement, at the request of the Engineer, bidders will be required to submit a "Statement of Experience" consisting of a list of previous projects of similar nature in order to receive Bid Documents. The Owner reserves the right to issue Bid Documents only to those Contractors deemed qualified. D. All Proposals must be accompanied by a Bank Cashier's Check, Bank Draft, Certified Check, or Bid Bond for not less than five percent (5%) of the total amount of the Bid, or as provided in the applicable sections of the "Standard Specifications". E. No Bid may be withdrawn after opening of Proposals without the consent of the Owner for a period of forty-five (45) days after the scheduled time of opening of Bids. F. The Contractor will be required to furnish a labor and material "Performance Bond" in the full amount of the Contract. G. The Contractor will be required to pay Prevailing Wages in accordance with all applicable laws. IV. REJECTION OF BIDS: The Owner reserves the right to reject any or all Proposals, to waive technicalities, and to accept the Proposal deemed to be most favorable to the Owner.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.