Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2024

October 9, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$1,813,923.00

Public - City

img_map_placeholder

Multiple Locations, Bellingham, WA

39

5

8

5

Subscribe to View Full Documents

Award: Granite Construction Company for $1,813,923.86 The improvement consists of: Overlay of Flynn Street near Electric Avenue to Decatur Street, Northshore Drive from Hayward Drive to Silver Beach Street, Academy Road from Northshore Drive to City Limits, Sylvan Street from Alabama Street to Silver Beach Avenue, and 40th Street from Mill Avenue to Donovan Avenue and Wildwood Drive to Bennett Ave. Including watermain replacement on Northshore Avenue, ADA ramp upgrades, and an RRFB on Electric Avenue near Flynn Street. Price Range: $1,900,000 - $2,200,000 All proposals must be on the Bid Proposal form provided by the City of Bellingham and must be accompanied by a certified check, cashier's check, cash, money order or bid bond payable to the Finance Director in an amount equal to or exceeding five percent (5%) of the total bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.