Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

February 10, 2025

November 20, 2026

I-95

Outdoor Lighting, Paving, Site Work

No Information to Display

$2,000,000.00

Public - State/Provincial

img_map_placeholder

I-95, Wilmington, DE

362

26

76

8

Subscribe to View Full Documents

Location: Farmington/felton Room Deldot Administration Bldg., 800 S. Bay Rd, Dover, De 19901 EXECUTIVE ORDER 11246 Dbe Goal: 15% Disadvantaged Business Enterprise Goal Ojt Trainees: 3 See Prospective Bidders Notes and Posted Ojt Manual for Details. Location: New Castle County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. The Improvements Consist of Furnishing All Labor and Materials for This Project Which Involves the Rehabilitation of Bridges 1-719, 1-720, 1-738 and 1-739. The Scope of Work for Each Bridge Varies Slightly, but in General Includes: Replacing the Existing Deck Overlay With a New Concrete Overlay, Replacement of Deck Joints, and Replacement of the Approach Slabs. Bridges 1-719 and 1-720 Will Receive Minor Substructure Repairs and a Refresh of the Paint Coating on the Steel Beams. Lighting Will Be Added Along the I-95 Corridor From Churchman's Crossing to the 295 Split. Construction Work Will Be Performed in Multiple Phases to Maintain Vehicular Traffic Through the Corridor. Follow Other Incidental Construction in Accordance With the Location, Notes and Details Shown on the Plans, and as Directed by the Engineer. Completion Time: All Work on This Contract Must Be Complete Within 655 Calendar Days. Extensions of Contract Time Due to Weather Are Specified in the Standard Specifications Section 108.7f, Weather Days. It is Estimated a Notice to Proceed is Issued Such That Work Starts on or About February 3, 2025. Question Deadline 08/27/2024 at 2:00 PM ET Questions: E-mail to; Dot-ask@delaware.gov Questions Regarding This Project Are to Be E-mailed to the Above Address No Less Than Six Business Days Prior to the Bid Opening Date in Order to Receive a Posted Response. Please Include the Contract Number in the Subject Line. Questions and Responses Are Posted at Bids.delaware.gov, and Bidx.com/de/. The Date of the Final Posted Questions and Answers Document Must Be Entered on the Submitted Certification Form. Surety Bond - Each Proposal Must Be Accompanied by a Deposit of Either Surety Bond or Security for a Sum Equal to at Least 10% of the Amount Bid. Performance-based Rating System - 29 Del.c. $6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a to Bid at the Time of Bid. Refer to 'general Notices' for Details. DE DOT - Rehabilitation of Bridges 1-719, 1-720, 1-738 and 1-739 on I-95

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.