Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 13, 2024

September 9, 2024

December 31, 2024

Melfort Street and Highway 41A

Paving, Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

Melfort Street and Highway 41A, Melfort, SK

26

15

6

Subscribe to View Full Documents

* No bid amount to be released for publication. The construction of Cell 1 at their existing Melfort Waste Disposal Ground (Landfill). The work is located approximately 1.8 km west of the City of Melfort, Saskatchewan at SW-11-45-19. The Bid should be accompanied by Bid Security in the form of a certified cheque or original bid bond, issued by a duly licensed surety company made payable to the Owner in the amount of ten percent (10%) of the bid price. The Tenderer with its bid should enclose a statement from the Surety substantially in the form of the Consent of Surety stating that the Surety is willing to supply the Contract Security referred to below. The Consent of Surety should be provided whether the Tenderer uses a bid bond or a certified cheque. Pursuant to Part 2, Schedule "B" Section 2-3.23.0 of the General Conditions of the Contract, the successful Tenderer shall provide a Labour and Materials Payment Bond and a Performance Bond upon the award of the Contract each in the amount of Fifty Percent (50%) of the Tender Price and with the same surety. The cost of the Bonds shall be borne by the Contractor. Mobilization and demobilization of equipment to site, including construction of haul roads, site safety, decommissioning of monitoring wells, and all other temporary works and facilities. Grubbing of all brush, roots, and stumps from within the grubbing limits and hauling to the appropriate stockpile. Stripping of approximately 0.200 m of topsoil from within the stripping limits and hauling of material to the appropriate stockpiles as shown in the drawings. Excavation of Cell 1, stormwater pond, leachate pond, and construction of associated clay liners, embankments, intermediate berms, access roads, all other fills, and stockpiling of excess material.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.