Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 30, 2024

October 7, 2024

May 26, 2025

To Be Determined

Demolition, Renovation, Site Work

No Information to Display

$381,450.00

Public - City

img_map_placeholder

To Be Determined, Martensdale, IA

18

21

10

Subscribe to View Full Documents

The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements in Martensdale, Iowa under one contract generally described as follows: Construction of improvements to the existing lagoon lift station to include; demolition of the existing above ground pump building, concrete pad, and trash basket with the abandonment of pipes as noted in the plans plus installation of the new above ground valve vault, Davit Crane, concrete pad, and approximately 314 LF of 8" ductile iron force main piping installed via trenched methods. Also included in the project is erosion control and site restoration. Bid Alternate A (additive) - New Influent Control Structure: Construction of a new influent control structure, backfill material and grading, an additional approximately 16 LF of 8" ductile iron force main piping, and demolition of the existing influent control structure. Bid Alternate B (additive) - New Emergency Backup Generator: Removal and replacement of the existing emergency backup generator. Est. Value: $ 423,000.00 Completion Date Explanation Work on Said Project Shall Commence Within Ten (10) Days of a Written Notice to Proceed. The Work Shall Be Substantially Completed Within 270 Calendar Days of Notice to Proceed and Completed and Ready for Final Payment in Accordance With Paragraph 15.06 of the General Conditions Within 300 Calendar Days of Notice to Proceed. Question Deadline 07/23/2024

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects