Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 19, 2024

April 28, 2026

Grove Avenue and Holt Boulevard

Outdoor Lighting, Paving, Site Work

No Information to Display

$20,323,888.00

Public - City

img_map_placeholder

Grove Avenue and Holt Boulevard, Ontario, CA

106

19

4

5

Subscribe to View Full Documents

Liquidated Damages $13,200 Per Calendar day License Requirements Class "A" Start/Delivery Date Ten (10) calendar days after the Notice to Proceed Project Duration Three hundred eighty (380) working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 09/05/2024 11:00 AM (PDT) The work to be performed consists in general of widening the approaches of the intersection of Grove Avenue and Holt Boulevard. It includes construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/relocations, and protection and/or relocation of existing facilities. The sewer system construction is on Grove Avenue from Airport Drive to Holt Boulevard, and Holt Boulevard from Grove Avenue to 500' East of Grove Avenue and consists of the installation of approximately 176 linear feet of 21-inch Extra Strength V.C.P. sewer main, approximately 411 linear feet of 20-inch Ductile Iron Class 350 with Protecto 401 Ceramic Epoxy Lining sewer main, approximately 1,016 linear feet of 21-inch Vitrified Clay Jacking Pipe within 48-inch steel casing pipe with trenchless pipe jacking method, and approximately 18 linear feet of 15-inch Extra Strength V.C.P. sewer main, installation of new sewer manholes; connection to existing sewer systems at two street intersections, implementation of traffic control during construction, and pavement repair and street restoration. The Contractor is responsible for protecting all existing utility services within the project site and providing time and working space for utility relocations as may be required during construction activity. Sewer installation in Grove Avenue under Union Pacific Railroad (UPRR) Bridge Crossing will be by trenchless method. The Contractor shall comply with the Union Pacific Railroad (UPRR) for the construction within the UPRR right of way, which includes construction of an encased sewer main underneath then Railroad Bridge. The Contractor is required to maintain traffic through the project site as required in these specifications. Other items of work or details not mentioned above that are required by the Plans, Specifications, or Technical Specifications, shall be performed, placed, constructed, and/or installed.

140 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.