Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

November 25, 2024

No Information to Display

453 Everhart Rd

Paving, Site Work

No Information to Display

$215,411.00

Public - City

img_map_placeholder

453 Everhart Rd, Corpus Christi, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

This project consists of the AE Design Services for the Dr. H.C. Dilworth Park It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and or Bids Amounts. Pavilion (CDBG). This will include: 1. The installation of a 30' x 30' steel pavilion building structure on an engineered32' x 32' concrete, elevated above existing grade to divert site drainage around the pavilion; 2. The installation of four (4) LED high-bay light fixtures and four (4) electrical receptacles in a secure enclosure; 3. Installation of a 4' concrete sidewalk from the street to the pavilion with a 60" turnaround midway. Provide positive drainage away from all new concrete sidewalk surfaces and pavilion foundation; 4. Verify decomposed granite track will meet and complies with Texas Accessible Standards at connection points with new concrete sidewalk. Make any necessary alterations required during the project; 5. Select demolition of a concrete pad and covered bench required for the placement of the new pavilion, The bench steel framing and steel barbeque pit, and trash receptacle will be removed by contractor and stored for Parks and Recreation Department; and 6. The seeding / sodding around the new pavilion as required. General Contractor is responsible for watering and general landscape maintenance as required to provide a minimum 75% established cover.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects