Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2024

September 2, 2024

June 19, 2025

Bush Rd

Site Work

No Information to Display

$2,011,400.00

Public - City

img_map_placeholder

Bush Rd, Jupiter, FL

40

18

19

5

Subscribe to View Full Documents

Question Deadline 07/22/2024 All questions about the meaning or intent of the Contract Documents shall be submitted to The Town of Jupiter Utilities, Attn: Steven Montemayor in writing by email (stevenm@jupiter.fl.us) Questions received less than three days prior to the date for opening of Bids will not be answered The nature and scope of this project is: Furnish all labor, equipment and materials necessary to improve the drainage and water distribution systems within Pennock Industrial Park and along the north end of Bush Road. The work includes, but is not limited to furnishing and installing seventeen (17) Type "C" ditch bottom inlets, one Type "E" inlet and two Type "J" inlets that are all interconnected with +/- 770 LF of 15"/18" RCP and +/- 1,660 LF of 15"/18" slotted RCP exfiltration trench; removing +/- 230 LF of a failing 60-inch HDPE drainage pipe and exfiltration trench and replacing it with 30 LF of 60-inch RCP and +/- 200 LF of slotted RCP exfiltration trench. An additional drainage improvement includes installing +/- 360 LF of 18"/24" Cured-In-Place Pipe liner. Water distribution improvements include removal and replacement of six (6) hydrant assemblies, furnishing and installing five (5) 8" distribution isolation gate valves with thrust collars, and +/- four 6"/8" water main deflection as necessary around proposed drainage. Right-of-Way restoration includes removal and replacement of Type "D" curb, Type "F" curb, header curb, concrete flumes, concrete and asphalt roadway turnouts, eight (8) asphalt roadway crossings, roadway lane repair, roadway edge repair, collector roadway shoulder stabilization, roadway mill and resurfacing, swale grading and sodding. Also included in the work is notification to affected property owners, temporary traffic control, coordination with Town staff to isolate portions of the distribution system, backfill, compaction, inspection, disinfection, testing, and same day restoration of business water services and property access. All questions shall be directed to Steven Montemayor in writing by email stevenm@jupiter.fl.us Bid Security in the amount of five percent (5%) of the Bid must accompany each bid in accordance with the Instructions to Bidders. The Town of Jupiter reserves the right to waive any irregularities and to reject any and all bids. The Town of Jupiter is an equal opportunity employer

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.