Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 26, 2024

August 26, 2024

December 24, 2024

212 E New Bern Rd

Asbestos Abatement, Demolition, Site Work

No Information to Display

$125,784.00

Public - City

img_map_placeholder

212 E New Bern Rd, Kinston, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The City of Kinston is now receiving sealed bids for the demolition of 212 E New Bern Road. (212 E. New Bern Ave, Kinston, NC (Super 8 Hotel)) Bids must include demolishing the building, removing all debris, trash, and junk located on the property, backfilling if needed, grading the disturbed area(s) smooth and the removal of asbestos material, if applicable. The successful bidder shall provide at no additional cost to the City, labor, equipment, and supplies to effectively tear down the structure located at 212 E New Bern Road and remove all debris existing or associated with the demolition within 30 days of the bid being awarded. The City may issue a purchase order to the successful bidder, which shall constitute a contract between the City of Kinston and the successful bidder. The City of Kinston reserves the right to reject any and all bids and to award the purchase order deemed in the best interest of the City. The City of Kinston reserves the right to waive minor irregularities in any bid if it is determined that such was the result of inadvertence or clerical error. The scope of work is to abate all asbestos material, demolish the building, remove all debris, trash, and junk located on the property, backfilling if needed, and grade the distributed area(s) smooth. Copies of the asbestos report and bid documents are attached as related documents. State of NC MBE/WBE participation goal: 10% (combined)

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.