Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 9, 2024

September 9, 2024

No Information to Display

Lane Rd

Paving, Site Work

No Information to Display

$3,000,000.00

Public - County

img_map_placeholder

Lane Rd, Lumpkin, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Lane Road North starting at SR 39 Connector/ Canyon Road then South 1.07 miles to the end of pavement and the start of the dirt road/dyke area between Lane Road North and South. Lane Road South starting from SR 27 then North 0.76 Miles to end of pavement and the start of the dirt road section/dyke area between Lane Road North and South. Project Scope: The project consists of two (2) roadway sections: Lane Road North starting at SR 39 Connector/ Canyon Road then South 1.07 miles to the end of pavement and the start of the dirt road/dyke area between Lane Road North and South. Lane Road South starting from SR 27 then North 0.76 Miles to end of pavement and the start of the dirt road section/dyke area between Lane Road North and South. The total Project is 1.9 Miles with a +/- 20 feet wide pavement section. The total square yards are +/- 23,408 SY. (The 0.49-mile dirt road section between Lane Road North and South is not included in this project) The project scope is shown on the plans/cross-sections/maps as prepared by Construction Materials Services, Inc. for each project as listed above. Each bid shall be accompanied by a Bid Bond in an amount of not less than five percent (5%) of the total bid amount. The Bid Bond may be in the form of a surety issued bond or cashier's check made payable to Stewart County. The Bid Bond shall be forfeited to Stewart County as liquidated damages if the bidder fails to execute the Contract and provide Performance and Payment Bonds within fifteen (15) days after being notified that he has been awarded the Contract. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Each bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. Each sealed envelope, containing a bid, must be plainly marked on the outside "Lane Road Resurfacing, Stewart County (Richland, GA)". If the bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER at the address given above. Bids may not be withdrawn for sixty (60) days after the time and date set for closing, except as allowed by O.C.G.A. Stewart County reserves the right to reject any and all proposals and to waive any technicalities.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects