Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 23, 2024

August 20, 2024

October 4, 2024

Multiple Locations

Site Work

No Information to Display

$106,100.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Jamestown, CO

3

4

2

2

Subscribe to View Full Documents

The Jamestown Phase 2 Project includes fifteen (15) mine features that were not closed as part of the Jamestown Phase 1 project that was completed in 2022-23. These features are located on a ridgeline that is very steep, densely vegetated, and requires crossing James Creek. The mines have very difficult access and will require hand work closures. Three (3) portals will be closed using bulkheads or grates with access, and twelve (12) vertical openings will be closed by hand backfill, polyurethane foam plugs, or wire rope netting. A Performance and Payment bond is required if the amount bid is $150,000.00 or greater. The CONTRACTOR shall furnish a labor and material payment bond for 100 percent of the original contract price and a performance bond for 100 percent of the original amount of the contract. The bonds are required by State Law, Title 24- 105, 202-203, C.R.S., as amended. The bonds shall be submitted using the State forms. A certified or cashier's check or bank money order may be accepted in lieu of the bonds. If a surety other than a bond is used, the State will hold fifty percent (50%) of the surety until the final settlement date and fifty percent (50%) for six (6) months after the final settlement date. The project is scheduled for construction between August 20, 2024 and October 4, 2024. This includes ten (10) days mobilization time. These dates are tentative and may change. The time of completion allowed for the project is forty five (45) calendar days after receipt of the Notice to Proceed. This includes ten (10) days mobilization time. The liquidated damages for this project will be $400.00 per day. Please see General Conditions, Article 39. The state reserves the right to reject any changes suggested to PO or Contact terms and conditions and award to the next most advantageous qualified responsive vendor.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.